Define the site problem and objective
Identify the main issues: energy consumption, comfort, equipment efficiency, maintenance cost, operational reliability or carbon impact, and define the project boundary.
Establish data and technical baselines
Use site surveys, equipment information, operating data and energy data to create a basis for comparison and avoid unsupported savings claims.
Build an integrated solution
Depending on the project, measures may include energy-system optimisation, controls and digitalisation, equipment upgrades, waste-heat utilisation, PV and storage, envelope measures or functional materials.
Implement, commission and operate
After implementation, commissioning, acceptance and ongoing O&M are required, with control strategies refined using operating data.
Verify results
Energy savings, ROI and performance improvements should be based on project data, normalised methods or clearly defined measurement boundaries.
Frequently Asked Questions
Is green and low-carbon engineering the same as installing renewable-energy equipment?
No. Renewable energy is one possible pathway. Projects may also involve energy management, system optimisation, equipment O&M, building-envelope measures and functional materials.
Can a fixed energy-saving percentage be guaranteed before assessment?
A fixed figure should generally not be promised without a project baseline and defined conditions. Expected performance should be assessed and later verified with operating data.