Green Manufacturing (VRS)
Steam/thermal efficiency retrofit and waste‑heat recovery for high‑energy industries.
Scope
Scope of Delivery
- Energy audit and baseline modeling
- Solution design and savings simulation
- EPC delivery and commissioning
- M&V for EMC
- Managed O&M
KPIs
Measurable KPIs (Examples)
| Metric | Range | Notes |
|---|---|---|
| Steam saving | 80–90% | Typical, depends on conditions |
| Overall saving | 20–40% | System boundary dependent |
| Payback | 12–36 months | Based on energy price and scale |